
Environmental Policy
New build construction, design and build, fit-out and refurbishment
Policy statement
Caha Interiors Ltd recognises that construction has a significant effect on the environment, through the energy and materials we use, the waste we produce and the impact of our sites on neighbours and the local area. We are committed to delivering our projects in a way that protects the environment, prevents pollution and reduces our carbon footprint, while meeting the requirements of our clients and of all applicable environmental legislation.
Our environmental management arrangements are aligned with the principles of ISO 14001. They are managed through our digital systems, so that environmental performance is measured with real data, reviewed regularly and improved year on year.
Scope
This policy applies to all Caha Interiors Ltd activities, offices and sites, including new build residential construction, design and build contracts, fit-out, joinery and refurbishment works, and to our directly employed trade teams. We require our subcontractors and suppliers to work in line with this policy.
Our commitments
- Compliance: we will comply with all environmental legislation, permits and consents, and with client and local authority requirements, including Codes of Construction Practice and planning conditions.
- Carbon and energy: we will measure and reduce the Scope 1, 2 and 3 emissions from our sites, vehicles and offices, using low-emission plant, efficient site accommodation, early connection to permanent power and reduced vehicle movements. We are committed to achieving net zero by 2050 or sooner.
- Waste and resources: we will follow the waste hierarchy (design out, reduce, reuse, recycle). Every project has a Site Waste Management Plan, waste is segregated on site and we aim to divert at least 90% of construction waste from landfill. Only licensed carriers and permitted facilities are used, with all waste transfer notes recorded.
- Materials: we will specify and buy responsibly sourced materials, including FSC or PEFC certified timber, favour local suppliers and low-carbon products, and order accurately to minimise over-supply and packaging.
- Pollution prevention: we will control dust, noise, vibration, light and emissions, prevent spills to ground and drains, and protect watercourses, with spill kits, bunded fuel storage and monitoring where required.
- Water: we will monitor water use on site and reduce it through efficient welfare facilities, water-saving equipment and the reuse of water where practical.
- Biodiversity: we will protect existing trees, habitats and wildlife on our sites, follow ecological recommendations and support biodiversity enhancements such as bird and bat boxes and planting.
- Neighbours and community: we will be considerate neighbours, working within agreed hours, keeping roads and footways clean and responding promptly to any environmental concerns raised by residents.
- Supply chain: we will set environmental requirements in our subcontracts and orders, and our subcontractors will report their waste, fuel and deliveries to us so the full impact of each project is captured.
Digital environmental tracking
Environmental performance on every CAHA project is recorded in our online tracking app, which site teams and subcontractors use to enter data directly from site. This gives one live record for each project and for the business as a whole.
| What we record | How it is used |
|---|---|
| Carbon and energy | Electricity and fuel use for site, plant and vehicles, converted to tonnes of CO2e to give live Scope 1, 2 and 3 totals per project, which feed our Carbon Reduction Plan. |
| Waste | Skip and waste volumes by type, recycling and landfill diversion rates, with waste transfer notes and carrier licences uploaded against each load. |
| Water | Meter readings and consumption per project. |
| Materials and deliveries | Deliveries, supplier origin, timber certification and vehicle movements, to track transport emissions and local spend. |
| Site monitoring | Dust, noise and vibration readings, environmental inspections, incidents and neighbour complaints, with actions and close-out recorded. |
| Reporting | Dashboards that show performance against targets in real time. Monthly reports for clients and the Employer's Agent are produced directly from the app, and annual totals are used for our emissions reporting. |
Targets and monitoring
We set targets for carbon, waste, water and environmental incidents at business and project level. Performance is reviewed monthly by project teams and at least annually by the directors, using the data held in our tracking app. Environmental incidents are investigated and the lessons are shared across our projects and supply chain.
Responsibilities and training
The Managing Director has overall responsibility for this policy. Project Managers and Site Managers are responsible for putting it into practice on each project and for making sure data is recorded accurately. All staff and site operatives receive environmental information at induction and through toolbox talks, and everyone working for CAHA is expected to play their part.
Communication and review
This policy is communicated to all employees and subcontractors, displayed at our offices and sites, and is available to clients and the public on request. It will be reviewed at least annually, or sooner if our activities or legal requirements change.
Thomas O’Connor
Managing Director | 25/11/2026
Caha Interiors Ltd | Tower Bridge Business Centre, 46-48 Smithfield, London, E1W 1AW | Registered in England No. 15356426 — Version v1.0 – Nov 2026

